Wind Turbine Building to Astana

Our turbines, specially manufactured for the main building of EXPO 2017, which is built in Kazakhstan’s capital Astana, have special wings that are resistant to -40 ° C cold. Now we have two wind turbines installed and commissioned on two wind turbines located on the Astana EXPO 2017. The transportation and installation of our 250 kW wind turbine we have produced for Çorum Special Provincial Administration has been started. After the completion of the installation process, it will be applied for acceptance procedures and TEDAŞ will be expected to issue a date for commissioning.